TIMELINE:
- Advance taken for material 70%.
- Next day material delivered on site.
- Side by side we started the ACP CNC work.
- On 3rd Day we completed the Fabrication work on site
- 4rth Day we installed the site with Hydra and our strong army.
We have made this work for a cloud kitchen located in Dharampur in Dehradun. Sardar ji had come to us with an idea that we will make the board by hanging it in the middle. But that board is not visible from both the sides, so we asked them to make a pole whose height will be 25 feet and it will be visible from both the sides. Then the work was done on the budget and the work started. We did a great job from our side.
Apollo’s 1-inch hollow pipe has been used to make it. And red oxide was treated on it. Later, a CNC cut design was applied to it. In which red color acrylic was installed from inside. After that many modules were installed in it and later it was closed from the back with black colored flex.
We used acp of ALEX Brand, frame of Apollo, light of Hi-Light Brand and acrylic of A-Cast Company. This is one year warranty product. If you are looking for sign of your business feel free to contact us.