Brick House Construction in Dehradun

1,950.002,450.00

FOUNDATION WORK:

  • As per site requirement.

STRUCTURE WORK:

  • As per site requirement.

DOOR & WINDOWS:

  • Main door 7.5 feet x 4ft & Other doors 3ft by 7ft – Flush Door with Satin Enamel Paint (Range Rs. 5000, fittings inclusive).
  • Windows: MS or UPVC Range Rs. 550/sqft. in Each Room Size 4ft by 4ft & 5ft by 4ft in Drawing Room/Living Area.
  • Bathroom Doors: Waterproof Flush Doors or Aluminium (Range Rs. 4,000) with fittings.
  • Frames of doors MS Apollo Heavy 16 Gouge 4in.
  • 1 Jali palla will be provided at the main door MS/Wood (Range Rs. 6,500).

PLUMBING & SANITARY:

  • 3 Layer 1500 Ltr Overhead tank on top (Brand: Supreme).
  • Plumbing: Drainage Pipes and PVC Work Supreme 4″ & 2.5″ & Astral .75″ & 1″.
  • Bathroom Sanitary Fittings: 20,000 for per bathroom sanitary fittings (Inclusive Diverters, vanity, seat and all sanitary fittings), brand Esco Jaguar.
  • Medium Size Vanity will be provided in one main bathroom.
  • Mirror Cabinet will provide in one main bathroom.
  • Sink Double Sink Handmade SS with Swan Neck: Total budget Rs. 6,000 for kitchen. Geyser and RO Fittings will be provided in kitchen.

ELECTRICAL:

  • AC Point: In Drawing Area and Master bedroom points will be provided. (Other areas electric work & Copper Pipe and AC Labour Extra as per requirement)*.
  • Call Bell Point: Included
  • Electrical earthing: Included Range Rs. 5,000/-
  • Inverter wiring will be provided.
  • MCB box : Polycab/Havels inclusive
  • Switches mid range Great White (Range Rs. 18/switch).
  • Concealed 9w (Brand: Havells, Range Rs. 160/unit).
  • Exhaust (Havells/ Helonix, Range Rs. 1,000) will be provided in bathroom and Usha Metal 14in heavy Exhaust in kitchen area.
  • Piping for CCTV: Additional
  • Power and Normal amp point Included in every room.
  • Coves and Fancy Lights: Additional
  • Wiring: HRFR Havels, as per requirement.
  • Isolator: Will be provided in main box.

TILES & STONE:

  • Kitchen Slab – RCC Slab with Brick Supports, Top – Z Black Granite cost – 250 rs / sq. feet – Max Slab Area 30sqft.
  • Kitchen Tiles 2×1, Range Rs. 40 – Max area 30sqft.
  • Parking Tiles – Only provided under slab area, Inclusive Range Rs. 40/sqft.
  • Room Tiles – Rs 50 / sq. feet
  • Tile Chemical Ultratech / Asian Paints, Dust Poenta, Cement CCI/Ultratech/Ambuja
  • Tiles in Bathroom 2 X 1 Rs. 40/sqft upto 7ft.

FABRICATION & CARPENTRY:

  • Kitchen slab Granite Range Rs. 200/sqft with double molding, maximum slab area 30sqft*.
  • Staircase Railings: MS with Enamel and wooden top or SS 202 Grade Steel for interior will be provided.

PAINT & PRIMER:

  • Paint Inside: 2 coats of putty, primer and emulsion paint on walls and satin paint on roof.
  • Paint Outside: 2 coats of waterproof putty, primer and apex asian paints, damp proof on sides.

FALSE CEILING:

  • Gypsum Ceiling in Master Bedroom & Drawing Area will be provided Range Rs. 75/sqft. with cove lights provision.

Time and Schedule

  • 12 months from the start of construction.

Payment Plan as per Bank CLP Mode

  • Advance – 10%
  • Foundation – 15%
  • Door Band – 5%
  • Ground linter – 15%
  • 1st floor linter level – 15%
  • At the time of Brickwork – 10%
  • At the time of Plaster -10%
  • Tile and paint work – 10%
  • Door and window work – 5%
  • Finishing – 5%

Terms and Conditions:

  • Rate from foundation to ground floor, 1st floor, 2nd floor only. For additional floors rate will be revised as per requirement.
  • Soakpit, Septic Tank and Water Tank slab will be measured in total area.
  • Electric and Water Connection will be provided by party. All bills will be paid timely by the party only.
  • All construction work will be done according to the approved plan. In case of any change cost will be revised as per requirement.
  • No duct or shaft area will be cut in the chargeable area.
  • The cost of making and passing the map, elevation, site inspection, structure drawing, electrical and plumbing drawing is not included in this.
Clear

Description

The process:

  1. Initial discussion and estimate.
  2. Free, honest, and detailed consultation at the site.
  3. Detailed quote with full specifications.
  4. Professional Project management, real Person-to-Person Service.
  5. Construction Phase, a) excavation to plinth beam, d) column casting, e) slab casting, f) brickwork, g) plaster.
  6. Completion and Aftercare.
  7. Maintenance.

FAQs:

  1. What are the rates for villa construction in Dehradun?
    Ans: Premium Work costs Rupees 2,500 per square feet, Mid Range Work costs Rupees 2,250 per square feet, & Economy Class costs Rupees 1,950 per square feet. In this, you only get the house, the rest movable furniture and interior work will be extra depending on design requirements. The rate of the structure ranges between Rs 1250 to Rs 1500 in all constructions and it completely depends on the size of the column, beam and steel. The remaining differences are in finishing materials such as tiles, stones, doors, windows, ceiling and sanitary fittings.
  2. What is the cost of making a house plan? What is the cost of approving the house map from MDDA and what are the other government charges?
    The normal architect’s expenses are only Rs 20 per sqft. The architect has to give all the drawings like; For MDDA submission, for structure, door window schedule, plumbing plan and electrical plan. The MDDA Fee & Government charges comes to an average of Rs 40 to 50 per square foot on total construction area. If you go for 3D layout, you have to pay around Rs 50 per sqft.
  3. How much does it cost for electric and water connections?
    Electric:
    The cost of electricity comes in terms of kilowatt, initially for construction you are charged at least 5 kilowatt. Till now approximately Rs 1500 per month has to be paid. Connection is available in 10 to 15 days. When the house is completed, it gets converted into residential and you have to pay around Rs 150 per month + the amount of electricity used.
    Water:Water connection also comes within a week to 10 days and initially you have to pay around Rs 7000 and later Rs 1500 for three months.
  4. What to do for government sewage connection?
  5. What is current FAR Ratio in Dehradun?
  6. What are the formalities and rules for basement?

Additional information

Type

Single-Storey House, Double-Storey House, Three-Storey House